The Irish National War Memorial Gardens Commemorative Bridge has arrived on site.
The three parts were transported from Italy’s Adriatic coast by ship to Dublin Port, and then by exceptional convoy to the site at the end of October. They are now being assembled next to the River Liffey in preparation for lifting the bridge into place.
Designed by ritchie*studio in collaboration with schlaich bergermann partner, the design team is working closely with the Irish Office of Public Works, the main contractor John Sisk & Son Ltd, and bridge manufacturer Cimolai Group, towards completion in early 2027.
OPW have released an illuminating short film of the progress.

© ritchie*studio